Service pricing calculator: build a quote from your costs
Enter your own time, job costs, quote-based fees, and target margin. The result is a cost-based quote for the scope you entered.
Separate installation from recurring maintenance: each has different materials, visits, and risk.
A one-time planting project with design, materials, crew support, and cleanup.
Editable example inputs. Replace them with your own numbers.
Owner delivery time: 20.00 h
Based on the assumptions you entered, before tax.
Based on your inputs, not a market rate or after-tax take-home pay.
(20.00 delivery + 2 other hours) × $25/h + $240 other labor + $265 direct costs + $105 other fixed costs = $1,160. $1,160 ÷ (1 − 0% fees − 30% margin) = $1,657.15 after rounding up to the cent.
Cost coverage: $1,160 ÷ (1 − 0% fees) = $1,160.
Owner pay is included as labor cost. Quote-based percentage fees are subtracted in the denominator.
Suggested equivalent: $1,660.00 per project across 1 project. Total quote comes first.
Enter and confirm your low and high total owner hours and material costs. These are planning assumptions, not market ranges.
Add both values to compare.
$1,657.15 exact · $1,660 suggested
Add both values to compare.
Enter a positive quote to see its profit and margin.
Start with the actual deliverable and billing unit: 1 project in the editable example. If the customer’s scope differs, change task quantities, hours per item, and billable unit count before relying on the result.
Illustrative inputs, not observed local prices.
20.00 delivery hours + 2 other hours at $25/hour = $550 owner labor. $240 other labor. $265 direct job costs, plus $105 other fixed costs, gives $1,160 fixed cost.
With a 30% target margin and 0% quote-based fees: $1,160 ÷ 0.70 = $1,657.15 exact minimum target price.
Plant survival, irrigation, permits, and ongoing care require a written project scope.
The result covers only entered costs and the owner pay target. It is a before-tax operating estimate; it does not establish a local market rate or legal requirements.
What design, planting, soil preparation, materials, hauling, and maintenance work are included?
A new planting area changes installation labor and materials; recurring care should be priced as a separate visit package.
The example covers 1 project. Divide the full quote by this count only when it matches what the customer will actually buy.
This page uses the QuoteForProfit cost-based formula and explicitly labeled, editable example assumptions. It does not use an external market price table. Method updated 2026-11-06.
Enter your own time, job costs, quote-based fees, and target margin. The result is a cost-based quote for the scope you entered.
Build one project quote from tasks, helpers, and direct costs. Use a written scope so the quote can be revised when a task changes.
Both methods start with an estimate of the work. The difference is how the customer sees and accepts time risk.
Margin measures profit as a share of the selling price. Markup measures profit as a share of cost.
A four-visit maintenance package with two treatment applications, priced as one scoped commitment.
A mow and edge visit. The hours per 1,000 square feet are your editable productivity assumption.