Service pricing calculator: build a quote from your costs
Enter your own time, job costs, quote-based fees, and target margin. The result is a cost-based quote for the scope you entered.
Quote launch work as one project. Ongoing maintenance should have its own scope, frequency, and cost model.
One five-page site with migration, two revision rounds, and testing.
Editable example inputs. Replace them with your own numbers.
Owner delivery time: 35.00 h
Based on the assumptions you entered, before tax.
Based on your inputs, not a market rate or after-tax take-home pay.
(35.00 delivery + 2 other hours) × $25/h + $0 other labor + $45 direct costs + $45 other fixed costs = $1,015. $1,015 ÷ (1 − 0% fees − 30% margin) = $1,450 after rounding up to the cent.
Cost coverage: $1,015 ÷ (1 − 0% fees) = $1,015.
Owner pay is included as labor cost. Quote-based percentage fees are subtracted in the denominator.
Suggested equivalent: $1,450.00 per project across 1 project. Total quote comes first.
Enter and confirm your low and high total owner hours and material costs. These are planning assumptions, not market ranges.
Add both values to compare.
$1,450 exact · $1,450 suggested
Add both values to compare.
Enter a positive quote to see its profit and margin.
Start with the actual deliverable and billing unit: 1 project in the editable example. If the customer’s scope differs, change task quantities, hours per item, and billable unit count before relying on the result.
Illustrative inputs, not observed local prices.
35.00 delivery hours + 2 other hours at $25/hour = $925 owner labor. $45 direct job costs, plus $45 other fixed costs, gives $1,015 fixed cost.
With a 30% target margin and 0% quote-based fees: $1,015 ÷ 0.70 = $1,450 exact minimum target price.
Hosting, third-party subscriptions, and content writing are excluded unless deliberately entered.
The result covers only entered costs and the owner pay target. It is a before-tax operating estimate; it does not establish a local market rate or legal requirements.
How many pages, content migrations, revisions, tests, and launch tasks are in the build?
New pages or functionality change the one-time project quote; ongoing maintenance needs a separate recurring scope.
The example covers 1 project. Divide the full quote by this count only when it matches what the customer will actually buy.
This page uses the QuoteForProfit cost-based formula and explicitly labeled, editable example assumptions. It does not use an external market price table. Method updated 2026-11-06.
Enter your own time, job costs, quote-based fees, and target margin. The result is a cost-based quote for the scope you entered.
Build one project quote from tasks, helpers, and direct costs. Use a written scope so the quote can be revised when a task changes.
Both methods start with an estimate of the work. The difference is how the customer sees and accepts time risk.
Margin measures profit as a share of the selling price. Markup measures profit as a share of cost.
One design project with two concept directions and two revision rounds.
A monthly package with 12 posts, two platforms, scheduling and engagement, and a reporting block.